Procurements

Noortechgroup  > Activities >  Procurements
| | 0 Comments

Noortec perform the procurements as per the QA/QC procedure which are mainly as the following point in brief,

  • Bidding to our vendors list
  • Evaluation for the received quotations from our vendors
  • Ordering
  • Following up for the manufacturing or delivery status
  • Inspections as per project ITP
  • Logistics & shipping to the site
  • Noortec has the ability to provide the following equipments through our vedors:
  • Low voltage switchgear & switchboards.
  • Low Voltage Distribution Board “LVDB”.
  • Motor Control Center “MCC”.
  • Distribution Boards “DB’s”.
  • HVAC panels.
  • Water & sewage pump panels.
  • L.V Transformers
  • Cable Trays / Ladders
  • L.V variable speed drives
  • Earthing & Lightning system.
  • Fire alarm system.
  • Lighting system.
  • Pressure & Temperature transmitters
  • All sensors & detectors types
  • Cables
  • Automation material